Upload log
From West Cambridge Active Travel (WCAT)
Jump to navigationJump to search
Below is a list of the most recent file uploads. See the gallery of new files for a more visual overview.
- 21:31, 23 September 2019 mrd45 talk contribs uploaded File:2019sep madingley road gcp exec board agenda item.pdf (GCP Exec Board Sep/Oct 2019 - Madingley Road agenda item)
- 15:30, 22 September 2019 mrd45 talk contribs uploaded a new version of File:Coton path handcycle.jpg (fix rotation)
- 15:29, 22 September 2019 mrd45 talk contribs uploaded File:Coton path handcycle.jpg (A man trying to navigate the Coton Path entry with a handcycle - he must cross over the 'wrong side' just to get by due to the sharp bend. Also the chicane itself is in very bad shape due to repeated collisions.)
- 15:14, 22 September 2019 mrd45 talk contribs uploaded File:Coton Path hourly ATC data.xlsx (2018/2019 Coton Path cycle traffic counts)
- 15:13, 22 September 2019 mrd45 talk contribs uploaded File:Cyclestreets49227-size640.jpg (https://www.cyclestreets.net/location/49227/)
- 15:08, 22 September 2019 mrd45 talk contribs uploaded File:Riflerangeroute.jpg (Rifle range route - possible busway option)
- 15:03, 22 September 2019 mrd45 talk contribs uploaded File:20190917 181115.jpg (Adams Road junction option)
- 15:03, 22 September 2019 mrd45 talk contribs uploaded File:20190917 181907.jpg (Adams Road junction option)
- 15:02, 22 September 2019 mrd45 talk contribs uploaded File:20190917 181910.jpg (Adams Road junction option)
- 14:58, 22 September 2019 mrd45 talk contribs uploaded File:20190917 183808.jpg
- 14:55, 22 September 2019 mrd45 talk contribs uploaded File:20190917 183812.jpg (Portion of proposed busway linking into West Cambridge site and crossing Coton Path.)
- 12:14, 13 August 2018 mrd45 talk contribs uploaded File:20180601 162450.jpg (Ridgeway junction with Storey's Way, new chicane gates + centre bollard (later removed) on June 1st, 2018)
- 12:12, 13 August 2018 mrd45 talk contribs uploaded File:20180601 162842.jpg (Bollards on Ridgeway that existed from end of May 2018 until August 2018)
- 12:11, 13 August 2018 mrd45 talk contribs uploaded File:20180813 110238.jpg (chicane gates in middle of Ridgeway August 2018)
- 11:43, 27 October 2017 mrd45 talk contribs uploaded File:Jjthomson view1.jpg
- 11:35, 27 October 2017 mrd45 talk contribs uploaded File:Babbage view1.jpg
- 08:41, 23 October 2017 mrd45 talk contribs uploaded File:20171023 092237.jpg (Bicycle with bent front wheel from collision on the morning of 23rd October 2017 at JJ Thomson Ave junction.)
- 10:03, 6 July 2017 mrd45 talk contribs uploaded File:University of Cambridge Shared Facilities Hub Cavendish III Exhibition.pdf (Boards from the Shared Facilities Hub / Cavendish III presentation 5 July 2017.)
- 15:54, 19 June 2017 mrd45 talk contribs uploaded File:170321 wccg mins final.pdf (West Cambridge Community Group minutes 21 March 2017)
- 13:47, 1 June 2017 mrd45 talk contribs uploaded File:CUED Civil Engineering Planning Boards 170522 final.pptx Updated (004).pdf (Cambridge University Civil Engineering Building Planning Boards 22nd May 2017)
- 12:25, 6 April 2017 mrd45 talk contribs uploaded File:14 0864 REM-AMENDED HARDWORKS PLAN 9 OF 9-1550932.pdf (Ridgeway hardworks 9/9)
- 18:56, 5 April 2017 mrd45 talk contribs uploaded File:Ridgeway 2017-04-05.jpeg (Appearance of bizarre wooden gates on partly completed Ridgeway at Storey's Way End.)
- 13:41, 14 February 2017 mrd45 talk contribs uploaded File:North newnham proposal xsections.png (proposed cross sections for 'improvements' to cycle network in north newnham)
- 13:39, 14 February 2017 mrd45 talk contribs uploaded File:North newnham proposal map.png (Overview of proposed cycling improvements near West Cambridge site)
- 13:35, 14 February 2017 mrd45 talk contribs uploaded File:Wilberforce junction.png (Junction proposal giving priority to Coton Path where it meets Adams Road.)
- 13:02, 14 February 2017 mrd45 talk contribs uploaded File:16 1134 OUT-TRANSPORT ASSESSMENT PART1-2090515.pdf (West Cambridge Transport Assessment (main document))
- 12:58, 14 February 2017 mrd45 talk contribs uploaded File:Jjthomson view.png
- 12:55, 14 February 2017 mrd45 talk contribs uploaded File:16 1134 OUT-DESIGN GUIDELINES PART4-1963109.pdf
- 12:54, 14 February 2017 mrd45 talk contribs uploaded File:16 1134 OUT-DESIGN GUIDELINES PART3-1963107.pdf
- 12:54, 14 February 2017 mrd45 talk contribs uploaded File:16 1134 OUT-DESIGN GUIDELINES PART2-1963102.pdf
- 12:48, 14 February 2017 mrd45 talk contribs uploaded File:Access and movement.png (Shows movement routes throughout site)
- 12:45, 14 February 2017 mrd45 talk contribs uploaded File:16 1134 OUT-DESIGN GUIDELINES PART1-1963098.pdf (West Cambridge Design Guidelines Part 1)
- 14:52, 1 February 2017 mrd45 talk contribs uploaded File:Statement to llf 2017-02-02 1b.pdf (Smarter Cambridge Transport proposals on Cambourne - Cambridge bus connection, plus cycling and walking links)
- 13:39, 1 February 2017 mrd45 talk contribs uploaded File:Better Bus Route overview final draft.pdf (A428 LLF "Better Bus Route" proposal for Cambourne - Cambridge)
- 13:39, 1 February 2017 mrd45 talk contribs uploaded File:Option Assessment Report option 6 Final Draft.pdf (A428 LLF report on alternative Cambourne - Cambridge bus options.)