Flagship Retrofit: Difference between revisions

From Crucible Network Research Projects
Jump to navigationJump to search
(Created page with "The Flagship Retrofit project is trialling ways in which public housing stock in the UK can be modified in ways that reduce energy usage through a combination of design intervent...")
 
No edit summary
Line 3: Line 3:
Funded by the Technology Strategy Board retrofit for the future programme.
Funded by the Technology Strategy Board retrofit for the future programme.


Led by William Box, Carnego Systems
Led by [[William Box]], Carnego Systems

Revision as of 16:46, 26 March 2011

The Flagship Retrofit project is trialling ways in which public housing stock in the UK can be modified in ways that reduce energy usage through a combination of design interventions and behaviour change.

Funded by the Technology Strategy Board retrofit for the future programme.

Led by William Box, Carnego Systems