Some kind of community centre with food and study areas, among other things. Supposed to serve what is currently a major missing piece of West Cambridge site: a social hub, a pub, convenience shop, lounge, etc.

Consultation

Response Ideas

Daniel:

Presently the plans call for the main arterial cycle route for the site (that connects to Clerk Maxwell Road and runs through the middle of the site) to run between the main catering facility (the SFH) and its outside seating. They are thinking about how to discourage cyclists from cycling at speed along this section, which is the wrong discussion to be having. An alternative proposal of running a dedicated cycle path along the north of the garden right next to Cavendish III seems possible and would avoid decades of conflict so I think we want to push for that.

Presently they are planning on having 280 cycle parking spaces with a maximum building capacity of 900 people. They are not sure whether this will be enough as modelling is difficult since some people are expected to walk from nearby departments rather than cycle to the building. Their transport consultant is still modelling this. I think we should push for space and funding to be pre-allocated for additional good quality cycle parking to be installed if the proposed parking turns out to be inadequate. Some of the proposed parking will be double stacking and I think we want to minimise the amount of that as double stackers are hard for some people to use and can be discriminatory, they can also be poorly made. Another thing to bear in mind for detailed is planning is to ensure that cycle parking is covered by CCTV so that the cycle theft issues that cause problems elsewhere on the site don't get repeated.

Caroline Stewart, Computer Lab Dept Secretary:

We are worried about the current proposal for the proposed Shared Facilities Hub building in West Cambridge.

The Council's Report in this week's Reporter at http://www.admin.cam.ac.uk/reporter/2016-17/weekly/6471/section7.shtml#heading2-19 and the detailed plans at http://www.prao.admin.cam.ac.uk/files/shared_facilities_hub_1st_report_plans.pdf . There are more details at http://www.westcambridge-sfh.co.uk/ .

These appear to be the same plans that were presented at the 'consultation' on 6 April, when they were roundly criticised by representatives of all the departments on the West Cambridge site.

The building combines a large cafeteria with seating for about 230 people, which would be run by the University Centre, various seminar rooms and study areas, and a new shared library for the departments in West Cambridge. The design may have been influenced by the "representative user group". This group was Chaired by the University's Catering Advisor and also included the Head of the Student Registry and the Librarian from Engineering, but there was no representatives from the Cavendish, the Vet School or the Computer Laboratory.

In particular, suggestions of a virtual college and a variety of independent food outlets in the style of a motorway service station have been ignored.

The Report will be on the agenda at the Discussion at 14:00 on Tuesday 11 July. Guidance about University Discussions can be found at https://www.governance.cam.ac.uk/governance/decision-making/discussions/Page s/proceedings.aspx

http://www.admin.cam.ac.uk/reporter/2015-16/weekly/6430/section9.shtml#headi ng2-16 is an interesting example of a recent Discussion. The last Report, on the abolition of class lists, was followed by a vote that stopped the proposal.

Please do attend the Discussion next Tuesday if you would like to contribute to it.

Daniel's proposed Discussion remarks

Deputy Vice-chancellor,

I am Daniel Thomas and I am a member of the Computer Laboratory, Peterhouse, and the West Cambridge Active Travel Group. The Shared Facilities Hub is much anticipated and has the potential to finally deliver on promised improvements to the West Cambridge Site that have been sought by site users for many years. It could have a transformative impact on the site and build a real community there. The proposals for an independently operated cafe/bar/pub that is open into the evening and an independently operated shop, in addition to the main catering facility, are particularly welcome. However, there are substantial problems with the present plans. I will focus on problems with transport and human architecture.

Presently the plans call for the arterial cycle route for the West Cambridge Site to run from Clerk Maxwell Road, through the middle of the site and between the sites' main catering facility (the Shared Facilities Hub) and its outside seating. This is a change from the site master plan and will cause substantial conflict between cyclists and pedestrians. No pedestrians want to dodge 15mph cycles while carrying their lunch to the table, no cyclists want to dodge pedestrains. Instead a separate dedicated cycle path running along the north of JJ Thomson Gardens would avoid all this conflict. At the Hauser Forum designers mixed a major cycle route with a pedestrianised plaza, and then when this caused conflict tried to ban cyclists from using the best link from the Coton Path to JJ Thomson Avenue. Let us not repeat this mistake.

The plans call for 280 cycle parking spaces and for the building to have a capacity for 900 people. They also call for some of the cycle parking to be double stacking. Both of these are concerning as double stacking cycle parking can be discriminatory and having over one third of building users arrive by cycle is not implausible. Space and funding for additional cycle parking should be pre-allocated and pre-approved in case the planned parking proves insufficient. The cycle parking should also be covered by CCTV to help prevent the theft of cycles and cycle components (including brake cables) that have plagued other parts of the West Cambridge Site.

If the Shared Facilities Hub is to be a success then the human architecture also needs to be planned before construction is completed. To build a community it should be overseen by the community including both site residents and staff. To be successful the Shared Facilities Hub must be welcoming and rooms must be easy to book. There have been failures in the management of existing facilities on the site. Units for shops have been constructed in the past and then not let out, apparently because the rent charged by the University was too high. The cafe at the new Sports Centre stands derelict as the rent charged by the University made it unviable. These mistakes should not be repeated and the community management of the Shared Facilities Hub should be able to set rents that are attractive to tenants so that we do not end up with another derelict facility.

The Shared Facilities Hub is desperately needed but there are substantial problems with the current plans including poor transport planning and the lack of a community engagement plan that may mean that it fails to deliver. Better consultation might help avoid problems, please consult with members of the community who have already indicated their interest by joining together in West Cambridge Active Travel group.